The Town of Lincoln’s Public Works department is responsible for the operation and maintenance of Lincoln’s Road network.
Spring 2025 maintenance programs are getting underway in April.
2025 Hydrant Flushing Program
Hydrant flushing is performed annually in the spring for the general maintenance of the water distribution system and covers the Beamsville, Vineland and Jordan serviced areas. This is essential work that maintains our hydrants and ensures good working condition for fire services.
Residents may experience temporary low-water pressure during flushing and/or cloudy or discoloured water conditions after flushing is completed. Running your taps with cold water for approximately 10 minutes will typically clear any cloudiness or discolouration.
2025 Street Sweeping Program
Street sweeping is performed twice a year, in Spring and Fall. For the 2025 spring season, street sweeping in urban areas will commence in early April, weather permitting.
The Town is divided into nine sections which will take approximately six weeks to complete, weather permitting. Rural areas will commence mid-April, weather permitting and will continue until completed.
Week | Urban Areas |
---|---|
BEAMSVILLE | |
Week 1 (April 7) | Between John St, Bartlett Rd, King St, & Ontario St |
Week 2 (April 14) | Between Greenlane Rd, Ontario St, King St, & Lincoln Ave |
Week 3 (April 21) | Between Bartlett Rd, King St, Mountain St, & Kinsmen Rd |
Week 4/5 (April 28) | Between Mountain St, Hillside Dr, Lincoln Ave, & King St |
Week 6 (May 12) | Between Bartlett Rd, Greenlane Rd, John St, & Ontario St |
VINELAND/JORDAN/CAMPDEN | |
Week 1 (April 7) | Vineland |
Week 2 (April 14) | Jordan |
Week 3 (April 21) | Victoria Shores & Jordan Station |
Week 4 (April 28) | Campden |
Questions? See contact info at left.
Background
Public Works oversees approximately 300km of roadway, including 49 bridges, 130 culverts, and over 700 fire hydrants. This is an important job, and the Town is committed to improving safe passage for residents, visitors, and businesses during the spring season, prioritizing our infrastructure to be maintained to the highest standards.
Each spring, our seasonal maintenance program includes:
- Street Sweeping of urban areas (approximately 10 weeks duration)
- Rural area street sweeping
- Hydrant flushing
- Pothole repairs