Road Rehabilitation Program
The 2022 Road Rehabilitation Program focuses on addressing roads in poor condition as well as actively maintaining the pavement on good roads. This balanced approach works to repair deteriorated roads while preventing the deterioration of good roads in the future - keeping the good roads good while not forgetting about the roads in poor condition.
The 2022 program will focus on a total of approximately 7 km of roads.
Road Rehabilitation efforts will include:
- Replacement of culverts that are currently failing, or have the potential to fail in the near future;
- Primary focus on cross culverts under roadways;
- Culvert replacements will take place prior to road rehabilitation. Tintern Road will be pulverized and graded followed by the application of surface treatment.
- Rehabilitation of urban roads includes milling of existing asphalt, placement of new hot mix asphalt and spot curb repairs.
Selected roads for the 2022 program include:
Road | To/From | Treatment | Length(km) |
---|---|---|---|
Hickory Lane | Carriage Rd to West Limit | Hot Mix Asphalt | 0.20 |
Leawood Court | Hickory Lane to North Limit | Hot Mix Asphalt | 0.10 |
Carriage Road | Greenlane to Homestead Drive | Hot Mix Asphalt | 0.25 |
Woodbridge Crescent | South Limit to Homestead Drive | Hot Mix Asphalt | 0.15 |
Vintage Court | South Limit to Homestead Drive | Hot Mix Asphalt | 0.11 |
Homestead Drive | Ontario Street to Garden Gate Terrace | Hot Mix Asphalt | 0.47 |
Queen Street | Mountain Street to King Street | Hot Mix Asphalt | 0.35 |
Tintern Road | Fly Road to Twenty Mile Road | Surface Treatment | 4.50 |
Total Length (km) |
|
| 6.13 |
What to Expect
Roads will remain open during all stages of the rehabilitation process. A notification will be sent to all residents that live on any of the proposed roads closer to the start date of construction.
Please visit the Town’s public engagement site - Speak Up Lincoln, to receive the most up-to-date information.